Conference: Publication Date: 16 August 2010
The focus of this paper is to integrate inspection evaluations based on NCHRP Report 534 with the suitable rehabilitation method to ensure the most effective allocation of funding. Four case studies are examined to illustrate how each suspension bridge has unique problems with the cable anchoring systems and how each issue was systematically addressed
Usage | Shares |
---|---|
Total Views 32 Page Views |
Total Shares 0 Tweets |
32 0 PDF Downloads |
0 0 Facebook Shares |
Total Usage | |
32 |