Publication: Publication Date: 1 August 2008
In conjunction with an effort throughout the Air Force to improve NDT reliability, it was determined that a standardized procedure qualification process was necessary to ensure the reliability of Air Force NDT procedures. A new process has been developed and is scheduled for formal implementation in the near future. This paper summarizes the new process requirements.
Usage | Shares |
---|---|
Total Views 44 Page Views |
Total Shares 0 Tweets |
44 0 PDF Downloads |
0 0 Facebook Shares |
Total Usage | |
44 |